Guide
How to pick a roofer you will not regret
The difference between a good roof and a bad one is mostly the crew, not the material. Both quotes list the same brand of shingle.
Or call (562) 358-3187Get it looked at
Three questions, and up to three La Habra Heights contractors. Free either way.
Your request is in.
We are matching it now against roofing contractors working in La Habra Heights and the surrounding area.
- Today, usually within the hour. The first contractor calls or texts the number you gave us. ASAP requests go out first.
- Up to three of them, no more. We cap it at three so you can compare without your phone melting.
- They come and look. Estimates are given after somebody has been on the roof, not over the phone.
- You decide, or you do not. There is nothing to cancel and nothing to pay us.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
Compare scope, not totals
A cheaper number for less roof is not a better price. Ask the lowest bidder which items on the other quotes they have left out, and why they think you do not need them.
Be careful with the deposit
Ten to thirty per cent is normal, often to order material. Full payment before work starts is not, and in several states it is not even legal. Hold the final payment until you have walked the job.
Ask for current certificates of insurance
Insurance certificates expire. A certificate dated eight months ago tells you what was true eight months ago. Ask for one issued this month.
Check the licence yourself
Every state that licenses roofing contractors publishes a free lookup. It takes two minutes and tells you whether the licence is current, who holds it, and whether there are complaints against it. Do it even when somebody has already vouched for them.
Prefer somebody you could drive to
A local address, a landline, and jobs in the area from more than three years ago are all worth more than a five-star rating. Warranties are only as good as the company still trading when you need them.
Get everything in writing, including the unknowns
The contract should say the material and the layers, who pulls the permit, the per-sheet price for replacing bad decking, what happens to the old material, the payment schedule, and the workmanship warranty. The decking clause is the one people forget and the one that moves the price.
In short
Three quotes, three licence checks, three certificates of insurance. It is a dull hour that routinely saves five figures.
Related questions
Should I repair or replace?
It depends almost entirely on how much life is left in the material. Ask any contractor who inspects it to give you a number of years and a reason. If two of them independently say the same thing, believe it.
Do I need a permit?
Yes, in nearly every jurisdiction a re-roof is permitted work. A contractor who suggests skipping it is telling you something useful about how they work.
Why three quotes and not one?
One quote is a number with no context. Three gives you a range, and the conversation about why they differ is where you learn what you are actually buying.
What is it going to cost?
Three questions, about a minute, and up to three La Habra Heights contractors come back to you.